Monitoring Physicochemical and Biological parameters in the river and lake system of Nestos – Public Power Corporation
This project was contracted by The Public Power Corporation S.A. to maintain environmental conditions, control environmental effects of a power plant, and to provide scientific support and early warning in case of emergency.
Implementation of the project included:
- Telemetry data
- Physico-Chemical field measurements (In-situ)
- Monitoring Chemical parameters (In vitro)
- Monitoring Biological parameters
The outcomes of the project, as well as the actions proposed by BEC, have become decisive tools for The Public Power Corporation S.A. to create policies harmonized with the European Policy concerning environmental pollution matters.
Project duration: 16-03-2010 to 30-04-2011
Project duration: 13-07-2011 to 30-07-2012
Project duration: 12-02-2013 to 31-01-2014